DocumentCode
3214961
Title
FirstEnergy´s experience with operating genco assets in the new MISO Ancillary-Service Market
Author
Palcic, Ron ; Tumbleson, Renee
Author_Institution
FirstEnergy Corp, USA
fYear
2009
fDate
15-18 March 2009
Firstpage
1
Lastpage
1
Abstract
Beginning Dec 9, 2008, the Midwest ISO (MISO) is scheduled to implement an Ancillary Service Market (ASM). The market design has been in progress for the previous two years with the completion of the ASM Market rules and tariff filing in February, 2007.
Keywords
Automatic testing; Economic forecasting; Failure analysis; ISO standards; Portfolios; Software packages;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Systems Conference and Exposition, 2009. PSCE '09. IEEE/PES
Conference_Location
Seattle, WA, USA
Print_ISBN
978-1-4244-3810-5
Electronic_ISBN
978-1-4244-3811-2
Type
conf
DOI
10.1109/PSCE.2009.4840007
Filename
4840007
Link To Document