Title :
Capacity choice, work-in-process inventory and throughput: A simulation study
Author :
Hegde, G.G. ; Kekre, Sunder ; Ramainurthy, K. ; Tadikamalla, P.R.
Author_Institution :
University of Pittsburgh
Keywords :
Assembly; Costs; Electric breakdown; Investments; Manufacturing systems; Production; Roentgenium; Throughput; Uncertainty; Workstations;
Conference_Titel :
Simulation Conference Proceedings, 1988 Winter
Print_ISBN :
0-911801-42-1
DOI :
10.1109/WSC.1988.716237