DocumentCode
3217008
Title
The Installation Status of the SNS Accumulator Ring
Author
Hechler, M. ; Cutler, R. ; Error, J. ; McGahern, B.
Author_Institution
Oak Ridge National Laboratory (ORNL), USA
fYear
2005
fDate
16-20 May 2005
Firstpage
3789
Lastpage
3791
Abstract
The Spallation Neutron Source (SNS) accumulator Ring, when completed in 2006, will be capable of delivering a 1.0 GeV, 1.4 MW proton beam to a liquid mercury target for neutron production. This paper presents an overview of the issues and logistics associated with the preparation and installation of the accelerator Ring System. The preparatory activities which occurred at BNL, vendors and at the SNS will be discussed as well as the installation sequence and status.
Keywords
Assembly systems; Buildings; Laboratories; Lattices; Neutrons; Particle beams; Power supplies; Procurement; System testing; Variable speed drives;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN
0-7803-8859-3
Type
conf
DOI
10.1109/PAC.2005.1591619
Filename
1591619
Link To Document