DocumentCode
3217250
Title
Notice of Retraction
The project management of the owners and the return on investment in BT mode
Author
Jiang Zaolong ; Wang Dongyan ; Liu Xiaojun
Author_Institution
Coll. of Civil Eng., Xi´an Univ. of Archit. & Technol., Xi´an, China
fYear
2011
fDate
22-24 April 2011
Firstpage
865
Lastpage
869
Abstract
Notice of Retraction
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
As a newly developing mode, BT mode is not a way of project contracting but a mode of investment and financing. The adoption of BT mode facilitates the development of urban infrastructure, and brings in economic benefits for the enterprise. But the lack of legal basis arose new problems, therefore the project management and analysis of financing risk under BT mode will be the key to bringing BT mode into operation.
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
As a newly developing mode, BT mode is not a way of project contracting but a mode of investment and financing. The adoption of BT mode facilitates the development of urban infrastructure, and brings in economic benefits for the enterprise. But the lack of legal basis arose new problems, therefore the project management and analysis of financing risk under BT mode will be the key to bringing BT mode into operation.
Keywords
construction; contracts; financial management; investment; project management; risk analysis; build-transfer mode; economic benefits; financing risk analysis; project contracting; project management; return on investment; urban infrastructure; Accidents; Contracts; Government; Investments; Law; Project management; BT mode; infrastructure; project management; return on investment; risk analysis;
fLanguage
English
Publisher
ieee
Conference_Titel
Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
Conference_Location
Lushan
Print_ISBN
978-1-4577-0289-1
Type
conf
DOI
10.1109/ICETCE.2011.5774325
Filename
5774325
Link To Document