DocumentCode :
3217401
Title :
Construction and Power Test of the Extraction Kicker Magnet for Spallation Neutron Source Accumulator Ring
Author :
Pai, C. ; Hahn, H. ; Hseuh, H. ; Lee, Y. ; Meng, W. ; Mi, J. ; Sandberg, J. ; Todd, R. ; Raparia, D. ; Tsoupas, N. ; Tuozzolo, J. ; Warburton, D. ; Wei, J. ; Weiss, D. ; Zhang, W.
Author_Institution :
Collider-Accelerator Department, Brookhaven National Laboratory, Upton, NY 11973; pai@bnl.gov
fYear :
2005
fDate :
16-20 May 2005
Firstpage :
3831
Lastpage :
3833
Abstract :
Two extraction kicker magnet assemblies that contain seven individual pulsed magnet modules each will kick the proton beam vertically out of the SNS accumulator ring into the aperture of the extraction Lambertson septum magnet. The proton beam then travels to the 1.4 MW SNS target assembly. The 14 kicker magnets and major components of the kicker assembly have been fabricated by BNL. The inner surfaces of the kicker magnets were coated with TiN to reduce the secondary electron yield. All 14 power supplies have been built, tested and delivered to ORNL. Before final installation, a partial assembly of the kicker system with three kicker magnets was assembled to test the functions of each critical component in the system. In this paper we report the progress of the construction of the kicker components, the TiN coating of the magnets, the installation procedure of the magnets and the full power test of a kicker magnet with the power supply.
Keywords :
Apertures; Assembly; Laboratories; Magnetic separation; Neutrons; Particle beams; Power supplies; Structural beams; Testing; Tin;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN :
0-7803-8859-3
Type :
conf
DOI :
10.1109/PAC.2005.1591638
Filename :
1591638
Link To Document :
بازگشت