DocumentCode
3217511
Title
R&D Status of the 700 MHz, 1MW Klystron for PEFP
Author
Kim, Sang-ho ; Chung, Bo-Hyun ; Jeon, Jai-ha ; Hong, Jin-suk ; Lee, Kang-ok ; Noh, S.J. ; Ko, Seung-Kook ; Chung, Kie-Hyung
Author_Institution
Korea Accelerator and Plasma Research Association, Cheorwon, Korea
fYear
2005
fDate
16-20 May 2005
Firstpage
3850
Lastpage
3852
Abstract
KAPRA (Korea Accelerator and Plasma Research Association) are undertaking the first phase R&D for the 1 MW, CW 700 MHz klystron, which is targeting the future stage of the PEFP (Proton Engineering Frontier Project) accelerator at KAERI (Korea Atomic Energy Research Institute). The objectives of the first phase R&D are 1) setting up infra structures/procedures for the design and fabrication, 2) developing a prototype klystron for proofs of principles, and 3) making a performance test of the prototype at a reduced duty. The second phase R&D is supposed to cover full power, CW operation and reliability issues. In this paper, a summary of the R&D status during the first phase for PEFP 1 MW, 700 MHz klystron is reported.
Keywords
Anodes; Electrons; Gaussian processes; Klystrons; Linear particle accelerator; Plasma accelerators; Proton accelerators; Prototypes; Radio frequency; Research and development;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN
0-7803-8859-3
Type
conf
DOI
10.1109/PAC.2005.1591645
Filename
1591645
Link To Document