DocumentCode
3218911
Title
Fabrication and Testing of the SRF Cavities for the CEBAF 12 GEv Upgrade Prototype Cryomodule Renascence
Author
Reece, C.E. ; Daly, E.F. ; Manning, S. ; Manus, R. ; Morgan, S. ; Ozelis, J.P. ; Turlington, L.
Author_Institution
Jefferson Lab, Newport News, VA 23606 U.S.A., reece@jlab.org
fYear
2005
fDate
16-20 May 2005
Firstpage
4081
Lastpage
4083
Abstract
GeV upgrade prototype cryomodule Renascence have been fabricated at JLab and tested individually. This set includes four of the “Low Loss” (LL) design and eight of the “High Gradient” (HG) design. The fabrication strategy was an efficient mix of batch job-shop component machining and in-house EBW, chemistry, and final-step machining to meet mechanical tolerances. Process highlights will be presented. The cavities have been tested at 2.07 K, the intended CEBAF operating temperature. Performance exceeded the tentative design requirement of 19.2 MV/m CW with less than 29 W dynamic heat dissipation. These results, as well as the HOM damping performance are presented.
Keywords
Business continuity; Damping; Fabrication; Flanges; Machining; Mercury (metals); Niobium; Prototypes; Testing; Welding;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN
0-7803-8859-3
Type
conf
DOI
10.1109/PAC.2005.1591724
Filename
1591724
Link To Document