DocumentCode
3219773
Title
Performance of Tesla Cavities after Fabrication and Preparation in Industry
Author
Pekeler, M. ; Bauer, S. ; vom Stein, P. ; Anders, W. ; Knobloch, J. ; Möller, W.D.
Author_Institution
ACCEL Instruments GmbH, Bergisch Gladbach, Germany
fYear
2005
fDate
16-20 May 2005
Firstpage
4221
Lastpage
4223
Abstract
In order to demonstrate cw operation of TESLA cavities in a linear accelerator driven FEL application, two TESLA cavities were manufactured for BESSY. After production, both cavities were prepared for vertical test at ACCEL’s premises using state of the art chemical polishing and high pressure water rinsing techniques. The cavities were tested in DESY’s vertical RF test installation. Accelerating gradients close to 25 MV/m were reached. One cavity was completed with helium vessel modified for cw operation, prepared with chemical polishing and high pressure water rinsing and assembled with the required high power coupler at ACCEL. The fully dressed cavity was then shipped under vacuum to BESSY and is currently under test in the horizontal cryostat HoBiCaT.
Keywords
Acceleration; Chemical products; Fabrication; Helium; Linear accelerators; Manufacturing industries; Production; Radio frequency; Testing; Textile industry;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN
0-7803-8859-3
Type
conf
DOI
10.1109/PAC.2005.1591771
Filename
1591771
Link To Document