DocumentCode
3221340
Title
Notice of Retraction
The preliminary research on the join and cooperation of the underground space in transfer station
Author
Bao Yinghua ; Xia Haishan
Author_Institution
Dept. of Archit. & Art, Beijing Jiaotong Univ., Beijing, China
fYear
2011
fDate
22-24 April 2011
Firstpage
3678
Lastpage
3680
Abstract
Notice of Retraction
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
Through analysis the problem of join and cooperation which the hub station faced in multiple transportation modes interchanging and multiple traffic cross. Puts forward that it should strengthen the main space and auxiliary space divisional, interior space and outer space transition, and the ground space on the underground space of the guidance and collaborative relationship from the angle of building space construction, and draw the conclusion that it should make the space organic reconstruction to optimize underground space in traffic streamline orderly organization, in order to improve the traffic transfer efficiency and spatial environment quality of the hub station.
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
Through analysis the problem of join and cooperation which the hub station faced in multiple transportation modes interchanging and multiple traffic cross. Puts forward that it should strengthen the main space and auxiliary space divisional, interior space and outer space transition, and the ground space on the underground space of the guidance and collaborative relationship from the angle of building space construction, and draw the conclusion that it should make the space organic reconstruction to optimize underground space in traffic streamline orderly organization, in order to improve the traffic transfer efficiency and spatial environment quality of the hub station.
Keywords
construction; geotechnical engineering; rail traffic; rapid transit systems; auxiliary space divisional; building space construction; collaborative relationship; hub station; interior space transition; multiple traffic cross; multiple transportation modes; outer space transition; preliminary research; space organic reconstruction; spatial environment quality; traffic streamline; transfer station; underground space; Art; Buildings; Cities and towns; Presses; Rails; Space stations; Transportation; Space join and cooperation; transfer station; underground space;
fLanguage
English
Publisher
ieee
Conference_Titel
Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
Conference_Location
Lushan
Print_ISBN
978-1-4577-0289-1
Type
conf
DOI
10.1109/ICETCE.2011.5774524
Filename
5774524
Link To Document