• DocumentCode
    3221897
  • Title

    Research on monitoring technique of construction linear for Guidan Highway super large bridge

  • Author

    Liu, Yao Dong ; Bai, Ying Hua ; Shi, Jun Feng ; Yu, Tian Qing

  • Author_Institution
    Sch. of Civil Eng. & Archit., Hubei Univ. of Technol., Wuhan, China
  • fYear
    2011
  • fDate
    22-24 April 2011
  • Firstpage
    3406
  • Lastpage
    3409
  • Abstract
    Guidan Highway super large bridge of Guangzhu railway engineering is a three-span (60m+100m+60m) continuous box girder bridge, which was constructed by using hanging basket cantilever method. On the basis of the analytic theory of 3D finite element forward/reverse, the linear monitoring of the whole bridge was done through controlling the template elevation of box girder (pre-camber). The result of monitoring shows that the linear of construction satisfies the requirements of design and specification and the bridge can be closed smoothly.
  • Keywords
    bridges (structures); cantilevers; construction; finite element analysis; railway engineering; 3D finite element forward-reverse theory; Guangzhu railway engineering; Guidan highway super large bridge; construction linear monitoring technique; hanging basket cantilever method; three-span continuous box girder bridge; Bridges; Civil engineering; Concrete; Educational institutions; Monitoring; Road transportation; Structural beams; Guidan Highway super large bridge; Hanging basket cantilever construction; construction linear monitoring; forward/reverse analysis; template elevation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
  • Conference_Location
    Lushan
  • Print_ISBN
    978-1-4577-0289-1
  • Type

    conf

  • DOI
    10.1109/ICETCE.2011.5774550
  • Filename
    5774550