    Discussion on issues of engineering alteration and construction claim

  • Author

    Gang, Chen ; Wang Culling

  • Author_Institution
    Coll. of Hydraulic & Environ. Eng., Three Gorges Univ., Yichang, China
  • fYear
    2011
  • fDate
    22-24 April 2011
  • Firstpage
    1171
  • Lastpage
    1174
  • Abstract
    In the civil and hydroelectric engineering management, engineering variations are always solved by the way of construction claim compensation, which no doubt increases the difficulty of the claim. In this paper, through definition of engineering changes and construction claims, and discriminating analysis of their processing program and mode of payment, it is presented that contractor should use the clause of engineering alteration rationally. Defects of drawing and technical specification, changes of owner´s require and strict inspection and inappropriate refuse of engineers should be listed in engineering alteration, try to make it legalization. In the end, an example is taken to illustrate the effect, which makes the contractor gain more benefit and decrease less loss.
  • Keywords
    civil engineering; contracts; management science; civil engineering management; construction claim compensation; contractor; engineering alteration; hydroelectric engineering management; Compaction; Contracts; Force; Inspection; Soil; Waste materials; construction claim; engineering alteration; engineering management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
  • Conference_Location
    Lushan
  • Print_ISBN
    978-1-4577-0289-1
  • Type

    conf

  • DOI
    10.1109/ICETCE.2011.5774582
  • Filename
    5774582