Discussion on issues of engineering alteration and construction claim
Author
Gang, Chen ; Wang Culling
Author_Institution
Coll. of Hydraulic & Environ. Eng., Three Gorges Univ., Yichang, China
fYear
2011
fDate
22-24 April 2011
Firstpage
1171
Lastpage
1174
Abstract
In the civil and hydroelectric engineering management, engineering variations are always solved by the way of construction claim compensation, which no doubt increases the difficulty of the claim. In this paper, through definition of engineering changes and construction claims, and discriminating analysis of their processing program and mode of payment, it is presented that contractor should use the clause of engineering alteration rationally. Defects of drawing and technical specification, changes of owner´s require and strict inspection and inappropriate refuse of engineers should be listed in engineering alteration, try to make it legalization. In the end, an example is taken to illustrate the effect, which makes the contractor gain more benefit and decrease less loss.
Keywords
civil engineering; contracts; management science; civil engineering management; construction claim compensation; contractor; engineering alteration; hydroelectric engineering management; Compaction; Contracts; Force; Inspection; Soil; Waste materials; construction claim; engineering alteration; engineering management;
fLanguage
English
Publisher
ieee
Conference_Titel
Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
Conference_Location
Lushan
Print_ISBN
978-1-4577-0289-1
Type
conf
DOI
10.1109/ICETCE.2011.5774582
Filename
5774582
Link To Document