This paper provides a comprehensive account of a mill-wide project to bring a thirty-plus year old market pulp mill into compliance with NFPA 70E requirements and to mitigate arc flash hazards to levels reasonable to allow effective maintenance. The project spanned three years and was completed in 2011. The major activities to be discussed (and through which the project had to progress) include decision to initiate, data collection or re-creation and update of single line diagrams, creation of database and software model, short circuit analysis, multiple upgrades or replacements to address overdutied equipment, arc flash analysis, protection/co-ordination changes to address let-through energy, equipment upgrades or replacements to address let-through energy and mitigate arc flash hazards and, finally, equipment labeling and training of personnel.
Keywords :
arcs (electric); electrical safety; hazards; paper industry; paper mills; personnel; training; NFPA 70E compliance; arc flash hazard mitigation; data collection; database creation; effective maintenance; electrical workplace safety; equipment labeling; mill-wide project; overdutied equipment; personnel training; pulp mill; short circuit analysis; single line diagrams; software model; Arc discharges; Circuit faults; Databases; Hazards; Personnel; Substations; Switchgear; Arc Flash Hazard; Electrical Workplace Safety; Short Circuit Analysis;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Pulp and Paper Industry Technical Conference (PPIC), Conference Record of 2012 Annual IEEE
Conference_Location :
Portland, OR
ISSN :
0190-2172
Print_ISBN :
978-1-4673-0406-1
Type :
conf
DOI :
10.1109/PPIC.2012.6292995
Filename :
6292995
Link To Document :
بازگشت