• DocumentCode
    3223169
  • Title

    The office building floor problems on the Wujiang building bulk concrete

  • Author

    Xingang, Wang ; Zhang Chen ; Lei, Chen

  • Author_Institution
    Civil Eng. Dept. Nanjing, Nanjing, China
  • fYear
    2011
  • fDate
    22-24 April 2011
  • Firstpage
    4650
  • Lastpage
    4653
  • Abstract
    Wujiang building project is made up of the office building, conference center, plaza basement which composed of the two back strip that is divided into three construction segments, the amount of each construction are concrete square section of 3992m3, 1426m3, 3992m3, which belong to a large volume of concrete. In order to avoid the bottom of the temperature cracks and large temperature stress, the process of pouring of concrete floor construction in winter takes heat insulation, temperature monitoring and other measures to control the rising and dropping speed of the concrete temperature.
  • Keywords
    concrete; construction; cracks; floors; stress analysis; thermal insulation; Wujiang building bulk concrete; concrete floor construction; concrete temperature; conference center; construction segments; heat insulation; office building floor problem; plaza basement; pouring process; temperature cracks; temperature monitoring; temperature stress; bleeding cracks control; construction arrangement site; temperature control; water treatment; work process;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
  • Conference_Location
    Lushan
  • Print_ISBN
    978-1-4577-0289-1
  • Type

    conf

  • DOI
    10.1109/ICETCE.2011.5774608
  • Filename
    5774608