DocumentCode
3223983
Title
Cycle time metrics for R&D semiconductor wafer fabrication
Author
Pierce, Neal G. ; Yost, Alan
Author_Institution
Adv. Products Res. & Dev. Lab., Motorola Inc., Austin, TX, USA
fYear
1995
fDate
13-15 Nov 1995
Firstpage
105
Lastpage
110
Abstract
This paper presents a case study for the successful development and effective use of cycle time metrics for fabricating semiconductor wafers in a research and development (R&D) environment. The metrics include multiples of theoretical cycle time (MTCT), breakdown analysis of cycle time, and cumulative queue times of baseline processes. Each of these metrics was applied to equipment types, process recipes, and overall pilot line performance as well as to production areas such as Films, Implant, and Etch.
Keywords
research and development management; semiconductor device manufacture; R&D semiconductor wafer fabrication; baseline processes; breakdown analysis; cumulative queue times; cycle time metrics; equipment types; etch; films; implant; multiples of theoretical cycle time; pilot line; process recipes; production; research and development; Electric breakdown; Etching; Fabrication; Implants; Job shop scheduling; Laboratories; Manufacturing processes; Queueing analysis; Research and development; Semiconductor device manufacture;
fLanguage
English
Publisher
ieee
Conference_Titel
Advanced Semiconductor Manufacturing Conference and Workshop, 1995. ASMC 95 Proceedings. IEEE/SEMI 1995
ISSN
1078-8743
Print_ISBN
0-7803-2713-6
Type
conf
DOI
10.1109/ASMC.1995.484350
Filename
484350
Link To Document