DocumentCode
3224522
Title
Choosing the Right Prioritisation Method
Author
Hatton, Sarah
Author_Institution
Univ. of Western Australia, Crawley
fYear
2008
fDate
26-28 March 2008
Firstpage
517
Lastpage
526
Abstract
There are many methods available for prioritising software requirements. Choosing the most suitable one can often be quite difficult. A number of factors need to be considered such as the project development methodology being used, the amount of time available, the amount of information known about requirements, the stage of the project and the degree of information about priority required. This paper examines the type of information available at different stages in a project and matches it to the properties of prioritisation methods. It then recommends the usage of specific prioritisation methods at certain stages of a project.
Keywords
software engineering; systems analysis; prioritisation methods; software development process; software requirements; Australia; Computer industry; Computer science; Decision making; Dynamic programming; Iterative methods; Road transportation; Scheduling; Software engineering; System testing; Analytical Hierarchy Process; Efficient Prioritisation; Hundred Dollar Method; MoSCoW; Requirements Prioritisation; Simple Ranking; Software Engineering;
fLanguage
English
Publisher
ieee
Conference_Titel
Software Engineering, 2008. ASWEC 2008. 19th Australian Conference on
Conference_Location
Perth, WA
ISSN
1530-0803
Print_ISBN
978-0-7695-3100-7
Type
conf
DOI
10.1109/ASWEC.2008.4483241
Filename
4483241
Link To Document