• DocumentCode
    3224631
  • Title

    Factory start-up and production ramp: yield improvement through signature analysis and visual/electrical correlation

  • Author

    Lee, Fourmun ; Wang, Ping ; Goodner, Ray

  • Author_Institution
    Motorola Inc., Chandler, AZ, USA
  • fYear
    1995
  • fDate
    13-15 Nov 1995
  • Firstpage
    267
  • Lastpage
    270
  • Abstract
    Variations in defect distributions and device yield patterns can provide significant information about the performance of processes used in the fabrication of integrated circuits. This paper describes how signature analysis and visual/electrical correlation were used to identify yield loss mechanisms during the start-up and production ramp of MOS 12, Motorola´s newest 8-inch high volume wafer fab. The identification, diagnosis, and resolution of two yield issues are presented as case studies,.
  • Keywords
    automatic optical inspection; failure analysis; integrated circuit yield; pattern recognition; production; MOS 12; Motorola high volume wafer fab; defect distributions; device yield patterns; diagnosis; fabrication; factory start-up; identification; integrated circuits; production ramp; signature analysis; visual/electrical correlation; yield improvement; yield loss mechanisms; Circuit analysis; Circuit testing; Fabrication; Information analysis; Inspection; Integrated circuit yield; Pattern analysis; Performance analysis; Production facilities; Random access memory;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Advanced Semiconductor Manufacturing Conference and Workshop, 1995. ASMC 95 Proceedings. IEEE/SEMI 1995
  • ISSN
    1078-8743
  • Print_ISBN
    0-7803-2713-6
  • Type

    conf

  • DOI
    10.1109/ASMC.1995.484383
  • Filename
    484383