DocumentCode
3224631
Title
Factory start-up and production ramp: yield improvement through signature analysis and visual/electrical correlation
Author
Lee, Fourmun ; Wang, Ping ; Goodner, Ray
Author_Institution
Motorola Inc., Chandler, AZ, USA
fYear
1995
fDate
13-15 Nov 1995
Firstpage
267
Lastpage
270
Abstract
Variations in defect distributions and device yield patterns can provide significant information about the performance of processes used in the fabrication of integrated circuits. This paper describes how signature analysis and visual/electrical correlation were used to identify yield loss mechanisms during the start-up and production ramp of MOS 12, Motorola´s newest 8-inch high volume wafer fab. The identification, diagnosis, and resolution of two yield issues are presented as case studies,.
Keywords
automatic optical inspection; failure analysis; integrated circuit yield; pattern recognition; production; MOS 12; Motorola high volume wafer fab; defect distributions; device yield patterns; diagnosis; fabrication; factory start-up; identification; integrated circuits; production ramp; signature analysis; visual/electrical correlation; yield improvement; yield loss mechanisms; Circuit analysis; Circuit testing; Fabrication; Information analysis; Inspection; Integrated circuit yield; Pattern analysis; Performance analysis; Production facilities; Random access memory;
fLanguage
English
Publisher
ieee
Conference_Titel
Advanced Semiconductor Manufacturing Conference and Workshop, 1995. ASMC 95 Proceedings. IEEE/SEMI 1995
ISSN
1078-8743
Print_ISBN
0-7803-2713-6
Type
conf
DOI
10.1109/ASMC.1995.484383
Filename
484383
Link To Document