• DocumentCode
    3224743
  • Title

    A shared approach to wafer fab support

  • Author

    Breeze, Michael ; Davies, John

  • Author_Institution
    Intel Ireland Ltd., Ireland
  • fYear
    1995
  • fDate
    13-15 Nov 1995
  • Firstpage
    287
  • Abstract
    For many years industry gurus have been urging closer links between suppliers and customers. At the Intel Fab 10 facility in Ireland, we believe this concept has been taken further than ever before in the semiconductor industry, via the Supplier Support Program. Intel´s Fab 10 facility does not follow the traditional Fab support structure, in that it has substituted supplier personnel to carry out the equipment engineering functions. The performance of the overall system in expediting the turn on of Intel´s billion dollar Pentium fab is discussed with respect to factory ramp time, the changing phases of the program and the consequences and expectations on line yield and die yield.
  • Keywords
    integrated circuit manufacture; Intel Fab 10 facility; Ireland; Pentium fabrication; Supplier Support Program; die yield; equipment engineering functions; factory ramp time; line yield; semiconductor manufacturing; supplier personnel; wafer fab support; Conference management; Continuous improvement; Electronics industry; Manufacturing; Personnel; Production facilities; Quality assessment; Semiconductor device manufacture; Semiconductor materials; Software quality;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Advanced Semiconductor Manufacturing Conference and Workshop, 1995. ASMC 95 Proceedings. IEEE/SEMI 1995
  • ISSN
    1078-8743
  • Print_ISBN
    0-7803-2713-6
  • Type

    conf

  • DOI
    10.1109/ASMC.1995.484388
  • Filename
    484388