    Schedule risk management method of construction project based on critical chain

  • Author

    Hong-bo, Liu

  • Author_Institution
    Zhengzhou Inst. of Aeronaut. Ind. Manage., Zhengzhou, China
  • fYear
    2011
  • fDate
    22-24 April 2011
  • Firstpage
    2561
  • Lastpage
    2563
  • Abstract
    The scheduling risk management of construction project based on critical chain discussed in this paper. Use the ideal completion time to estimate the last-time of each job and the project´s critical chain was built on account of the single-resource constraints. After the risk analysis for each job, the feeding buffer and project buffer was established. The buffer area was treated as resort of risk control and management.
  • Keywords
    construction; critical path analysis; project management; risk management; scheduling; buffer area; construction project; feeding buffer; project buffer; project critical chain; risk analysis; risk control; risk management scheduling; Job shop scheduling; Project management; Risk management; Rivers; Schedules; construction project; critical chain; scheduling risk management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
  • Conference_Location
    Lushan
  • Print_ISBN
    978-1-4577-0289-1
  • Type

    conf

  • DOI
    10.1109/ICETCE.2011.5774705
  • Filename
    5774705