Schedule risk management method of construction project based on critical chain
Author
Hong-bo, Liu
Author_Institution
Zhengzhou Inst. of Aeronaut. Ind. Manage., Zhengzhou, China
fYear
2011
fDate
22-24 April 2011
Firstpage
2561
Lastpage
2563
Abstract
The scheduling risk management of construction project based on critical chain discussed in this paper. Use the ideal completion time to estimate the last-time of each job and the project´s critical chain was built on account of the single-resource constraints. After the risk analysis for each job, the feeding buffer and project buffer was established. The buffer area was treated as resort of risk control and management.
Keywords
construction; critical path analysis; project management; risk management; scheduling; buffer area; construction project; feeding buffer; project buffer; project critical chain; risk analysis; risk control; risk management scheduling; Job shop scheduling; Project management; Risk management; Rivers; Schedules; construction project; critical chain; scheduling risk management;
fLanguage
English
Publisher
ieee
Conference_Titel
Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
Conference_Location
Lushan
Print_ISBN
978-1-4577-0289-1
Type
conf
DOI
10.1109/ICETCE.2011.5774705
Filename
5774705
Link To Document