Title :
Schedule risk management method of construction project based on critical chain
Author_Institution :
Zhengzhou Inst. of Aeronaut. Ind. Manage., Zhengzhou, China
Abstract :
The scheduling risk management of construction project based on critical chain discussed in this paper. Use the ideal completion time to estimate the last-time of each job and the project´s critical chain was built on account of the single-resource constraints. After the risk analysis for each job, the feeding buffer and project buffer was established. The buffer area was treated as resort of risk control and management.
Keywords :
construction; critical path analysis; project management; risk management; scheduling; buffer area; construction project; feeding buffer; project buffer; project critical chain; risk analysis; risk control; risk management scheduling; Job shop scheduling; Project management; Risk management; Rivers; Schedules; construction project; critical chain; scheduling risk management;
Conference_Titel :
Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
Conference_Location :
Lushan
Print_ISBN :
978-1-4577-0289-1
DOI :
10.1109/ICETCE.2011.5774705