DocumentCode :
3225183
Title :
Fuzzy optimizations of contract incentive and duration for engineering project
Author :
Yaohong, Yang ; Junhua, Zhang
Author_Institution :
Water Resources Sch., North China Inst. of Water Conservancy & Electr. Power, Zhengzhou, China
fYear :
2011
fDate :
22-24 April 2011
Firstpage :
2288
Lastpage :
2291
Abstract :
Because of uncertainty of engineering project progress, contract incentive of project client and construction duration of contractor are determined under uncertain environment. The fuzzy optimization model for contract incentive and duration under fuzzy environment is presented. The problem of fuzzy exponent is resolved by using fuzzy distance. Then we develop the double-loop fuzzy genetic algorithms to solve the fuzzy optimization model. Finally, a case is computed to verify the validness of model and the feasibility of solution method.
Keywords :
construction; contracts; fuzzy set theory; genetic algorithms; incentive schemes; construction; contract incentive; double-loop fuzzy genetic algorithms; engineering project; fuzzy optimizations; Computational modeling; Contracts; Genetic algorithms; Helium; Optimization; Schedules; Water conservation; duration; fuzzy optimization; genetic algorithms; incentive;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
Conference_Location :
Lushan
Print_ISBN :
978-1-4577-0289-1
Type :
conf
DOI :
10.1109/ICETCE.2011.5774707
Filename :
5774707