DocumentCode
322606
Title
Dutch distribution cable: improvements in construction, reliability, environment and efficiency
Author
Grotenhuis, B.J. ; Kerstens, A. ; van Riet, M.J.M.
Author_Institution
REMU Energy Company, Netherlands
Volume
3
fYear
1997
fDate
1997
Firstpage
42522
Abstract
In this paper the existing medium voltage cable grid in the Netherlands is shown. The perfect performance of these cables is responsible for the very short outage times in our country. Typical is the belted paper 12 kV cable with a very good performance since 1905. However, problems with this type of cable have occurred more frequently. With the arrival of the newly developed 12 kV three phase XLPE cable we can solve the paper cable problems. The main solution is using the XLPE cable for high and strongly changing loads. For the normal thin distribution cables the existing paper cable can be used for more than 40 years. The future development of cable systems will be in two ways: firstly by diagnostics like 0.1 Hz partial discharge measurements; and secondly by monitoring and by protection with integrated fibre optics in all types of power cables. With these developments we will come to ´total cable management´
Keywords
distribution networks; 12 kV; Netherlands; construction improvements; distribution cable; efficiency improvements; environmental improvements; high loads; integrated fibre optics; medium voltage cable grid; monitoring; partial discharge measurement; protection; reliability improvements; short outage times; strongly changing loads; thin distribution cables; three phase XLPE cable; total cable management;
fLanguage
English
Publisher
iet
Conference_Titel
Electricity Distribution. Part 1: Contributions. CIRED. 14th International Conference and Exhibition on (IEE Conf. Publ. No. 438)
Conference_Location
Birmingham
ISSN
0537-9989
Print_ISBN
0-85296-674-1
Type
conf
DOI
10.1049/cp:19970514
Filename
667953
Link To Document