DocumentCode
322608
Title
The technical and economic case for the use of three dimensional mapping for the installation of electric power cables
Author
Morgan, A.
Volume
3
fYear
1997
fDate
1997
Firstpage
42614
Abstract
The paper reviews the experimental work carried out by MEB on the practical usage of three dimensional mapping. Evidence is provided to show how the technique has proved to be an effective pre-planning tool which has significantly reduced cable installation costs and increased the use of trenchless technology. The technique involves using electromagnetic locators and then ground based radar
fLanguage
English
Publisher
iet
Conference_Titel
Electricity Distribution. Part 1: Contributions. CIRED. 14th International Conference and Exhibition on (IEE Conf. Publ. No. 438)
Conference_Location
Birmingham
ISSN
0537-9989
Print_ISBN
0-85296-674-1
Type
conf
DOI
10.1049/cp:19970517
Filename
667957
Link To Document