• DocumentCode
    3235901
  • Title

    The method of prediction of subsidence of buildings by constructing gray-time series combined model which is unequal time-interval

  • Author

    Weiqing, Chen ; Lei, Wang

  • Author_Institution
    Coll. of Civil & Archit. Eng., Guangxi Univ., Nanning, China
  • fYear
    2011
  • fDate
    22-24 April 2011
  • Firstpage
    4647
  • Lastpage
    4649
  • Abstract
    This paper expounds how to constructing gray-time series combined model which is the unequal time-interval firstly, then forecasts subsidence of a building in future by using this model. Compared with the model of GM(1,1), the precision of the forecast by using combined model is improved to a certain extent. This proves that to forecasts subsidence of a building in future by using the model is available.
  • Keywords
    structural engineering; time series; building subsidence forecasts; gray-time series combined model; unequal time-interval; Buildings; Deformable models; Educational institutions; Electronic mail; Mathematical model; Predictive models; Time series analysis; AR(p); GM(1,1); gray-time series combined model which is the unequal; randomentry term; time-interval; trend term;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
  • Conference_Location
    Lushan
  • Print_ISBN
    978-1-4577-0289-1
  • Type

    conf

  • DOI
    10.1109/ICETCE.2011.5775220
  • Filename
    5775220