• DocumentCode
    323704
  • Title

    Least cost planning for system expansion in Eastern Europe

  • Author

    Whittington, H.W.

  • Author_Institution
    Edinburgh Univ., UK
  • fYear
    1994
  • fDate
    34620
  • Firstpage
    42461
  • Lastpage
    42463
  • Abstract
    With the break up of the Communist system in Eastern Europe, the electricity supply networks of the countries of Eastern Europe were characterised by low efficiency, low availability, poor maintenance and high costs. Those responsible for the supply of electrical energy realised that key to industrial reconstruction must be the provision of a reliable, affordable electricity supply. The building of new power stations is sometimes the only solution to cope with increased demand. Many options present themselves to those responsible for the extension of system capacity. The process of choosing the most acceptable alternative is usually termed “least cost expansion planning” and is the subject of this paper
  • Keywords
    economics; Eastern Europe; demand; electricity supply networks; extension; generating system capacity; industrial reconstruction; least cost planning; power system expansion; reliability; selection process;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Demand-side Management and Resource Planning in the United Kingdom and Europe (Digest No. 1994/186), IEE Colloquium on
  • Conference_Location
    London
  • Type

    conf

  • Filename
    675255