DocumentCode :
3238807
Title :
A bidirectional evolutional algorithm for the resource-constrained project scheduling problem
Author :
Ya, Li ; Jingyao, Zhang
Author_Institution :
Polytech. Sch., ShenYang LiGong Univ., Fushun, China
fYear :
2011
fDate :
27-29 May 2011
Firstpage :
613
Lastpage :
617
Abstract :
After providing a new representation of the solution for the resource-constrained project scheduling problem (RCPSP), a bidirectional evolutional algorithm is given. This algorithm will firstly find the solutions with potential good properties and then use these selected solutions to guide the searching process. All the searching operations are applied in the two direction problems that are the original problem and the reverse problem which is created by reversing the precedence constraints in the original problem and keeping the resource constraints unchanged. The simulation results reveal the efficiency of this algorithm.
Keywords :
evolutionary computation; scheduling; search problems; RCPSP; bidirectional evolutional algorithm; precedence constraints; resource-constrained project scheduling problem; searching process; Gold; Schedules; Scatter search; evolutional algorithm; project scheduling; reverse scheduling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Communication Software and Networks (ICCSN), 2011 IEEE 3rd International Conference on
Conference_Location :
Xi´an
Print_ISBN :
978-1-61284-485-5
Type :
conf
DOI :
10.1109/ICCSN.2011.6014645
Filename :
6014645
Link To Document :
بازگشت