Reducing development time and cost through effective project management
Author
Soldano, Dominick
Author_Institution
Scitor Corp., Menlo Park, CA, USA
fYear
1995
fDate
10-12 Oct 1995
Firstpage
370
Lastpage
373
Abstract
The more complex a development effort, the more difficult it is to reduce or control the project´s schedule and cost. The use of concurrent engineering in the development cycle only exacerbates the problem by increasing the number of departments and people involved at any point in the development effort. Breakdowns in the process can have devastating effects on the project schedule and double or even triple the development cost. Here, the author describes how these project elements can be effectively controlled using proven project management techniques. A number of companies involved in complex development efforts have been able to greatly reduce both development time and cost by applying these techniques
Keywords
costing; economics; product development; project engineering; project management; research and development management; R&D; complex development efforts; concurrent engineering; development cost; development cycle; development time; project management; project schedule; Acceleration; Concurrent engineering; Costs; Electric breakdown; Job shop scheduling; Manufacturing processes; Product development; Project management; Prototypes; Virtual manufacturing;
fLanguage
English
Publisher
ieee
Conference_Titel
Northcon 95. I EEE Technical Applications Conference and Workshops Northcon95
Conference_Location
Portland, OR
Print_ISBN
0-7803-2639-3
Type
conf
DOI
10.1109/NORTHC.1995.485098
Filename
485098
Link To Document