Reducing development time and cost through effective project management
Author :
Soldano, Dominick
Author_Institution :
Scitor Corp., Menlo Park, CA, USA
fYear :
1995
fDate :
10-12 Oct 1995
Firstpage :
370
Lastpage :
373
Abstract :
The more complex a development effort, the more difficult it is to reduce or control the project´s schedule and cost. The use of concurrent engineering in the development cycle only exacerbates the problem by increasing the number of departments and people involved at any point in the development effort. Breakdowns in the process can have devastating effects on the project schedule and double or even triple the development cost. Here, the author describes how these project elements can be effectively controlled using proven project management techniques. A number of companies involved in complex development efforts have been able to greatly reduce both development time and cost by applying these techniques
Keywords :
costing; economics; product development; project engineering; project management; research and development management; R&D; complex development efforts; concurrent engineering; development cost; development cycle; development time; project management; project schedule; Acceleration; Concurrent engineering; Costs; Electric breakdown; Job shop scheduling; Manufacturing processes; Product development; Project management; Prototypes; Virtual manufacturing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Northcon 95. I EEE Technical Applications Conference and Workshops Northcon95
Conference_Location :
Portland, OR
Print_ISBN :
0-7803-2639-3
Type :
conf
DOI :
10.1109/NORTHC.1995.485098
Filename :
485098
Link To Document :
بازگشت