• DocumentCode
    3241159
  • Title

    Research on the National Compensation issues for the provincial highway construction

  • Author

    Chen, Tung-Tsan ; Hsu, Yao T.

  • Author_Institution
    Dept. of Constr. Eng., Nat. Quemoy Univ., Kinmen, Taiwan
  • fYear
    2010
  • fDate
    29-31 Oct. 2010
  • Firstpage
    1207
  • Lastpage
    1211
  • Abstract
    The Highway consists of the roads used by vehicles and the other public infrastructure facilities around it that the lack of good management and the poor facilities usually causes the government compensation for damage. In order to solve these situations, we collected lots of cases in the study for conclusions. First, we divide the reasons into 6 categories. There are the factors in rock fall, bridge rupture, surface of road, gutter, trees beside the road, traffic signs and so on. Secondly, we suggest 6 categories of 18 actions to solve them. Nowadays to improve actions the government shall be limited by budget. However, the study uses the fuzzy AHP (Analytic Hierarchy Process, AHP) method to evaluate the actions priority. The frames of references are technology, policy, economy and 11 sub-references.
  • Keywords
    budgeting; construction; decision making; fuzzy set theory; government policies; road building; fuzzy AHP; fuzzy analytic hierarchy process; government compensation; government policy; national compensation issue; provincial highway construction; Bridges; Europe; Magnetic resonance imaging; Materials; Pragmatics; Roads; Fuzzy AHP; highway construction; national compensation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management (IE&EM), 2010 IEEE 17Th International Conference on
  • Conference_Location
    Xiamen
  • Print_ISBN
    978-1-4244-6483-8
  • Type

    conf

  • DOI
    10.1109/ICIEEM.2010.5645983
  • Filename
    5645983