DocumentCode :
3246437
Title :
Time decision-making of highway reconstruction based on trigger point mechanism
Author :
Haiqian, Cheng ; Wen, Tian ; Qinghua, Cheng
Author_Institution :
Wuhan Univ. of Technol., Wuhan, China
fYear :
2011
fDate :
22-24 April 2011
Firstpage :
1818
Lastpage :
1820
Abstract :
The adaptation of highway to economic development is a continuous and dynamic process, which presents a state from adaptation to inadaptation and to adaptation. The decision on the reconstruction time of highway is a significant macroscopical decision-making problem. Both on the basis of analyzing the service level of highway and the theory of trigger point mechanism, this paper constructed time decision-making model of highway reconstruction and put forward the application method of the model. In addition, taking the Shen Yi highway reconstruction project in Hubei for example, an empirical analysis has been made to check the feasibility and efficiency of the model, which provides decision basis to determine reconstruction time.
Keywords :
decision making; road building; Hubei; Shen Yi highway reconstruction project; economic development; highway reconstruction time; service level; time decision making model; trigger point mechanism; Analytical models; Decision making; Economics; Manuals; Roads; Vehicles; highway reconstruction; service level; time decision-making; trigger point mechanism;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
Conference_Location :
Lushan
Print_ISBN :
978-1-4577-0289-1
Type :
conf
DOI :
10.1109/ICETCE.2011.5775728
Filename :
5775728
Link To Document :
بازگشت