DocumentCode :
3253973
Title :
A study on the postponement investment decision-making of coal bed methane project based on the real options
Author :
Zhu, Yong-Fei ; Zhang, Sheng-You ; Feng, Li-Jie ; Wang, Jin-Feng
Author_Institution :
Sch. of Manage., Tianjin Univ., Tianjin, China
fYear :
2010
fDate :
29-31 Oct. 2010
Firstpage :
183
Lastpage :
185
Abstract :
A large number of random factors in the process of the coal bed methane (CBM) development project can lead to a high degree of risk and uncertainties, and the traditional investment decision-making methods (for example DCF method) ignored the value of investment opportunities which were brought by the project environment´s uncertainties and management flexibilities. Introducing real options method, we analyzes options´ characteristics of CBM project in this paper, and constructed the investment decision-making model based on the postponement strategy, and illustrates the application of the model through case studies. So this paper provides new ideas and methods for investment decision-making of coal-bed methane project development.
Keywords :
coal; decision making; investment; mining industry; project management; strategic planning; CBM project; coal bed methane development project; coal bed methane project development; investment decision making model; investment opportunities; postponement investment decision making; project environment uncertainties; project management flexibilities; real options method; Coal bed methane (CBM) project; Postponement investment decision-making; Real options;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management (IE&EM), 2010 IEEE 17Th International Conference on
Conference_Location :
Xiamen
Print_ISBN :
978-1-4244-6483-8
Type :
conf
DOI :
10.1109/ICIEEM.2010.5646641
Filename :
5646641
Link To Document :
بازگشت