• DocumentCode
    3254402
  • Title

    Study of claim identification model in international project based on process control ideology

  • Author

    He, Wei-Yi ; Chen, Xiao-Ming

  • Author_Institution
    Sch. of Manage., Tianjin Univ. of Technol., Tianjin, China
  • fYear
    2010
  • fDate
    29-31 Oct. 2010
  • Firstpage
    263
  • Lastpage
    268
  • Abstract
    This paper tends to explore the issues relevant to contractor´s claims opportunity identification. According to the condition of construction in FIDIC 1999, a process control-based model is presented in which the claims risk analysis, contract state analysis, event analysis, schedule analysis and cost analysis were combined in conjunction with the system of identifying claim opportunities at contract signing stage, construction stage and completion stage. The model is useful to improve the efficiency of contractor´s claim disposal, and keep contractor from missing the best timing of claim.
  • Keywords
    construction industry; contracts; process control; project management; risk analysis; claim identification model; claims risk analysis; completion stage; construction condition; construction stage; contract signing stage; contract state analysis; contractor claims opportunity identification; cost analysis; event analysis; international project; process control ideology; schedule analysis; Government; Schedules; claim; international project; process control;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management (IE&EM), 2010 IEEE 17Th International Conference on
  • Conference_Location
    Xiamen
  • Print_ISBN
    978-1-4244-6483-8
  • Type

    conf

  • DOI
    10.1109/ICIEEM.2010.5646662
  • Filename
    5646662