Title :
Time-cost trade-off problem under uncertainty incorporating multi-objective genetic algorithm and fuzzy sets theory
Author :
Ding, Carlting H. ; Fujimura, S. ; Wei, X. ; Wei, W.
Author_Institution :
Grad. Sch. of Inf., Production & Syst., Waseda Univ., Kitakyusyu, Japan
Abstract :
The time-cost trade-off problem (TCTP) is an important branch in the project scheduling problem. However, the duration and cost of each activity could change stochastically as a result of uncertain factors. To meet the needs of real projects, an improved approach based on trapezoid fuzzy numbers is applied to estimate the uncertainty of time and cost. And then α-cut method is applied to decide the risk level. Furthermore, improved crossover and mutation methods for multi-objective genetic algorithm (MOGA) are used to make a large-scale computation possible. The efficiency of the proposed approach is verified by comparison with previous researches. In addition, economic analysis skill of finance cost is integrated into the new model to provide greater flexibility to managers when making decisions. Finally, time-cost tables under different risk levels for case examples are given and the advantages are investigated based on computation results.
Keywords :
costing; fuzzy set theory; genetic algorithms; project management; scheduling; crossover method; finance cost analysis; fuzzy set theory; multiobjective genetic algorithm; mutation method; project scheduling; time-cost tables; time-cost trade-off problem; trapezoid fuzzy numbers; Computational modeling; Concrete; Modems; Robustness; Structural beams; Finance cost; Fuzzy sets theory; Multi-objective genetic algorithm; Project scheduling; Risk management; Time-cost trade-off problem;
Conference_Titel :
Industrial Engineering and Engineering Management (IE&EM), 2010 IEEE 17Th International Conference on
Conference_Location :
Xiamen
Print_ISBN :
978-1-4244-6483-8
DOI :
10.1109/ICIEEM.2010.5646668