• DocumentCode
    3259446
  • Title

    Applied research of earned value theory in the engineering project management

  • Author

    Wang, Yaping ; Bai, Sijun ; Guo, Yuntao

  • Author_Institution
    Sch. of Manage., Northwestern Polytech. Univ., Xi´´an, China
  • fYear
    2011
  • fDate
    8-10 Aug. 2011
  • Firstpage
    595
  • Lastpage
    598
  • Abstract
    The three objectives of a project are quality, cost and schedule, and the traditional EV theory is on the integrated control of schedule and cost. In this paper, the quality is considered, so that the three objectives can be controlled at the same time. This paper establishes a tri-relationship among them using an econometric mode, analyzes the state of a project at a certain time, determines the cost overruns or savings, the schedule delay or ahead of, uses the relationship between time and cost and takes effective corrective measures to achieve dynamic and optimal management.
  • Keywords
    project management; econometric mode; engineering project management; integrated control; optimal management; value theory; earned value; optimum combination; project management; substituted ratio of time and cost;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Emergency Management and Management Sciences (ICEMMS), 2011 2nd IEEE International Conference on
  • Conference_Location
    Beijing
  • Print_ISBN
    978-1-4244-9665-5
  • Type

    conf

  • DOI
    10.1109/ICEMMS.2011.6015751
  • Filename
    6015751