Title :
Fast multi-domain clock skew scheduling for peak current reduction
Author :
Huang, Shih-Hsu ; Chang, Chia-Ming ; Nieh, Yow-Tyng
Author_Institution :
Dept. of Electron. Eng., Chung Yuan Christian Univ., Chung Li, Taiwan
Abstract :
Given several specific clocking domains, the peak current minimization problem can be formulated as a 0-1 integer linear program. However, if the number of binary variables is large, the run time is unacceptable. In this paper, we study the reduction of this high computational expense. Our approach includes the following two aspects. First, we derive the ASAP schedule and the ALAP schedule to prune the redundancies without sacrificing the exactness (optimality) of the solution. Second, we propose a zone-based scheduling algorithm to solve a large circuit heuristic ally.
Keywords :
clocks; integer programming; linear programming; minimisation; scheduling; ALAP schedule; ASAP schedule; integer linear program; multi-domain clock skew scheduling; peak current reduction; zone-based scheduling; Circuits; Clocks; Cost function; Delay; Integer linear programming; Intersymbol interference; Minimization; Polynomials; Processor scheduling; Scheduling algorithm;
Conference_Titel :
Design Automation, 2006. Asia and South Pacific Conference on
Print_ISBN :
0-7803-9451-8
DOI :
10.1109/ASPDAC.2006.1594691