DocumentCode
3266238
Title
Identifying and managing risks for automatic test systems
Author
Calhoun, Cynthia C.
Author_Institution
NASA Software IV&V Fac., Fairmont, VA, USA
fYear
1999
fDate
1999
Firstpage
479
Lastpage
482
Abstract
Risk is the possibility of suffering loss. In a development project, the loss describes the impact to the project which could be in the form of diminished quality of the end product, increased costs, delayed completion, or failure. This paper discusses the methods and techniques for identifying and managing the risks involved with automatic test systems development
Keywords
automatic test equipment; automatic test software; program verification; risk management; software maintenance; automatic test systems; context of risk; development process; maintenance process; phase independent activities; risk identification; risk management; software verification; statement of risk; Automatic testing; Error correction; Instruments; NASA; Personnel; Project management; Risk management; Software engineering; Software testing; System testing;
fLanguage
English
Publisher
ieee
Conference_Titel
AUTOTESTCON '99. IEEE Systems Readiness Technology Conference, 1999. IEEE
Conference_Location
San Antonio, TX
ISSN
1080-7725
Print_ISBN
0-7803-5432-X
Type
conf
DOI
10.1109/AUTEST.1999.800417
Filename
800417
Link To Document