• DocumentCode
    3266238
  • Title

    Identifying and managing risks for automatic test systems

  • Author

    Calhoun, Cynthia C.

  • Author_Institution
    NASA Software IV&V Fac., Fairmont, VA, USA
  • fYear
    1999
  • fDate
    1999
  • Firstpage
    479
  • Lastpage
    482
  • Abstract
    Risk is the possibility of suffering loss. In a development project, the loss describes the impact to the project which could be in the form of diminished quality of the end product, increased costs, delayed completion, or failure. This paper discusses the methods and techniques for identifying and managing the risks involved with automatic test systems development
  • Keywords
    automatic test equipment; automatic test software; program verification; risk management; software maintenance; automatic test systems; context of risk; development process; maintenance process; phase independent activities; risk identification; risk management; software verification; statement of risk; Automatic testing; Error correction; Instruments; NASA; Personnel; Project management; Risk management; Software engineering; Software testing; System testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    AUTOTESTCON '99. IEEE Systems Readiness Technology Conference, 1999. IEEE
  • Conference_Location
    San Antonio, TX
  • ISSN
    1080-7725
  • Print_ISBN
    0-7803-5432-X
  • Type

    conf

  • DOI
    10.1109/AUTEST.1999.800417
  • Filename
    800417