Title :
Modeling for Optimization of Distribution Network Project Construction Scheduling
Abstract :
Reasonable distribution network project construction scheduling helped improving the economics of distribution network construction. Aiming at the lowest risk of distribution network, an optimization model of distribution network project construction was established, which combined with the practical distribution network construction projects and taken the types of distribution network construction projects, varieties of constraints and the impacts of climate to the duration of constructions into account. Combination of complex algorithm and genetic algorithm ensured convergence performance and global search capability in solving the optimization model. Results of the example proved the effectiveness of the optimization model and algorithm, which provided a reliable reference for distribution network project construction scheduling.
Keywords :
genetic algorithms; power distribution economics; power system simulation; scheduling; distribution network construction economics; distribution network construction projects; distribution network project construction optimization model; distribution network project construction scheduling; genetic algorithm; Intelligent systems; Composite genetic algorithm; Distribution network project construction scheduling; Genetic algorithm; The lowest risk;
Conference_Titel :
Intelligent System Design and Engineering Applications (ISDEA), 2013 Third International Conference on
Conference_Location :
Hong Kong
Print_ISBN :
978-1-4673-4893-5
DOI :
10.1109/ISDEA.2012.227