DocumentCode :
3280579
Title :
Telecomm disaster recovery planning for electric utilities
Author :
Banks, Dan R.
fYear :
2005
fDate :
8-10 May 2005
Abstract :
This paper provides the rural electric utility operator with guidelines for telecomm disaster recovery planning. These considerations are for utilization during long-term telecommunications service outages and provide recommended alternative measures to be taken.
Keywords :
business continuity; electricity supply industry; power system planning; telecommunication services; long-term telecommunications service; rural electric utility; telecomm disaster recovery planning; Batteries; Central office; Guidelines; Hurricanes; Ice; Power generation; Power industry; Power system planning; Telecommunication services; Telephony;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Rural Electric Power Conference, 2005
Conference_Location :
San Antonio, TX, USA
Print_ISBN :
0-7803-8958-1
Type :
conf
DOI :
10.1109/REPCON.2005.1436337
Filename :
1436337
Link To Document :
بازگشت