DocumentCode
3288479
Title
Effectiveness of auxiliary system monitoring & continuous hydrogen scavenging operation on hydrogen-cooled generator at power plant
Author
Gopinath, S.
Author_Institution
Coal-Fired Power Plant, Electr. Maintenance Sect. (Tech.), Jimah Energy Ventures (JEV), Port Dickson, Malaysia
fYear
2009
fDate
7-8 Dec. 2009
Firstpage
151
Lastpage
160
Abstract
This paper presents the effectiveness of generator auxiliary system such as seal oil system, stator cooling water system and gas control system with continuous hydrogen scavenging operation for hydrogen-cooled Synchronous Generator at power plant. Effective operation of synchronous generator depends on sufficient cooling medium (hydrogen) inside the casing. Besides that, good sealing system needed to prevent hydrogen gas leakage and sufficient cooling purposes. Deionized water circulated into stator for cooling purposes with emphasized on low conductivity level for prevention of any damage to the copper strands in the stator winding.
Keywords
electrical conductivity; power plants; stators; synchronous generators; auxiliary system monitoring; continuous hydrogen scavenging operation; copper strands; damage prevention; deionized water; gas control system; hydrogen gas leakage; hydrogen-cooled synchronous generator; low conductivity; power plant; seal oil system; stator cooling water system; stator winding; Control systems; Cooling; Hydrogen; Monitoring; Petroleum; Power generation; Seals; Stators; Synchronous generators; Temperature control; Seal oil; Synchronous generator; deionizer water; purity; scavenging operation;
fLanguage
English
Publisher
ieee
Conference_Titel
Energy and Environment, 2009. ICEE 2009. 3rd International Conference on
Conference_Location
Malacca
Print_ISBN
978-1-4244-5144-9
Electronic_ISBN
978-1-4244-5145-6
Type
conf
DOI
10.1109/ICEENVIRON.2009.5398654
Filename
5398654
Link To Document