• DocumentCode
    3288479
  • Title

    Effectiveness of auxiliary system monitoring & continuous hydrogen scavenging operation on hydrogen-cooled generator at power plant

  • Author

    Gopinath, S.

  • Author_Institution
    Coal-Fired Power Plant, Electr. Maintenance Sect. (Tech.), Jimah Energy Ventures (JEV), Port Dickson, Malaysia
  • fYear
    2009
  • fDate
    7-8 Dec. 2009
  • Firstpage
    151
  • Lastpage
    160
  • Abstract
    This paper presents the effectiveness of generator auxiliary system such as seal oil system, stator cooling water system and gas control system with continuous hydrogen scavenging operation for hydrogen-cooled Synchronous Generator at power plant. Effective operation of synchronous generator depends on sufficient cooling medium (hydrogen) inside the casing. Besides that, good sealing system needed to prevent hydrogen gas leakage and sufficient cooling purposes. Deionized water circulated into stator for cooling purposes with emphasized on low conductivity level for prevention of any damage to the copper strands in the stator winding.
  • Keywords
    electrical conductivity; power plants; stators; synchronous generators; auxiliary system monitoring; continuous hydrogen scavenging operation; copper strands; damage prevention; deionized water; gas control system; hydrogen gas leakage; hydrogen-cooled synchronous generator; low conductivity; power plant; seal oil system; stator cooling water system; stator winding; Control systems; Cooling; Hydrogen; Monitoring; Petroleum; Power generation; Seals; Stators; Synchronous generators; Temperature control; Seal oil; Synchronous generator; deionizer water; purity; scavenging operation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Energy and Environment, 2009. ICEE 2009. 3rd International Conference on
  • Conference_Location
    Malacca
  • Print_ISBN
    978-1-4244-5144-9
  • Electronic_ISBN
    978-1-4244-5145-6
  • Type

    conf

  • DOI
    10.1109/ICEENVIRON.2009.5398654
  • Filename
    5398654