Title :
Investigation of performance degradation for TNB newly commissioned combined cycle power plant Case study at PD1, Tuanku Jaafar Power Station, Port Dickson
Author :
Lee, C.H. ; Mamat, Zainul Asri
Author_Institution :
Power Plant Optimization Group, TNB Res. Sdn. Bhd., Bangi, Malaysia
Abstract :
Phase 1 of Tuanku Jaafar Power Station, Port Dickson (PD1) is one of the newest power plants in Tenaga Nasional Berhad (TNB). This combined cycle plant with the nominal capacity of 750 MW started its commercial operation in 2005. However, in less than 2 years of its operation, the plant has indicated significant capacity degradation. Consequently, TNB carried few investigations to determine the cause for the capacity degradation. This paper describes the approach taken and the outcomes of the investigations.
Keywords :
combined cycle power stations; performance evaluation; power generation reliability; Port Dickson; TNB; Tenaga Nasional Berhad power plant; Tuanku Jaafar Power Station; capacity degradation; combined cycle power plant; performance degradation; power 750 MW; Asset management; Atmospheric modeling; Blades; Combustion; Degradation; Group technology; Power generation; Testing; Thermodynamics; Turbines; non-recoverable degradation; performance degradation; thermodynamic modeling;
Conference_Titel :
Energy and Environment, 2009. ICEE 2009. 3rd International Conference on
Conference_Location :
Malacca
Print_ISBN :
978-1-4244-5144-9
Electronic_ISBN :
978-1-4244-5145-6
DOI :
10.1109/ICEENVIRON.2009.5398657