DocumentCode
3288532
Title
Investigation of performance degradation for TNB newly commissioned combined cycle power plant Case study at PD1, Tuanku Jaafar Power Station, Port Dickson
Author
Lee, C.H. ; Mamat, Zainul Asri
Author_Institution
Power Plant Optimization Group, TNB Res. Sdn. Bhd., Bangi, Malaysia
fYear
2009
fDate
7-8 Dec. 2009
Firstpage
124
Lastpage
128
Abstract
Phase 1 of Tuanku Jaafar Power Station, Port Dickson (PD1) is one of the newest power plants in Tenaga Nasional Berhad (TNB). This combined cycle plant with the nominal capacity of 750 MW started its commercial operation in 2005. However, in less than 2 years of its operation, the plant has indicated significant capacity degradation. Consequently, TNB carried few investigations to determine the cause for the capacity degradation. This paper describes the approach taken and the outcomes of the investigations.
Keywords
combined cycle power stations; performance evaluation; power generation reliability; Port Dickson; TNB; Tenaga Nasional Berhad power plant; Tuanku Jaafar Power Station; capacity degradation; combined cycle power plant; performance degradation; power 750 MW; Asset management; Atmospheric modeling; Blades; Combustion; Degradation; Group technology; Power generation; Testing; Thermodynamics; Turbines; non-recoverable degradation; performance degradation; thermodynamic modeling;
fLanguage
English
Publisher
ieee
Conference_Titel
Energy and Environment, 2009. ICEE 2009. 3rd International Conference on
Conference_Location
Malacca
Print_ISBN
978-1-4244-5144-9
Electronic_ISBN
978-1-4244-5145-6
Type
conf
DOI
10.1109/ICEENVIRON.2009.5398657
Filename
5398657
Link To Document