DocumentCode :
3295371
Title :
Improvement of Railway Power Supplying Devices Diagnostics
Author :
Kosakov, A.A.
fYear :
2005
fDate :
21-27 March 2005
Firstpage :
14
Lastpage :
15
Abstract :
Nowadays there exists problem of railway power supplying devices diagnostics, especially for Sverdlovsk railway. Sverdlovsk railway is situated at regions with different climate and level of pollution, so exploitation conditions of railway supplying devices at the Urals are hard for insulation in comparison with other regions of Russia. Insulation failure is one of the most cause of power supplying devices failures. Causeless shutdown is mostly insulation failure too, because it mostly means surface discharge on inorganic insulation (porcelain, glass), that hasn´t been detected. The problem of insulation diagnostics is not only with methods, but also with tradition of periodical tests. So, to improve insulation diagnostics, we must add insulation quality monitoring to traditional periodical tests.
Keywords :
insulation testing; partial discharges; power supplies to apparatus; railway electrification; Sverdlovsk railway; inorganic insulation; insulation diagnostics; insulation failure; insulation quality monitoring; power supplying devices failures; railway power supplying devices diagnostics; surface discharge; Costs; Insulation testing; Insulators; Monitoring; Partial discharges; Power supplies; Power transformer insulation; Rail transportation; Substations; Voltage;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Modern Technique and Technologies, 2005. MTT 2005. 11th International Scientific and Practical Conference of Students, Post-graduates and Young Scientists
Conference_Location :
Tomsk
Print_ISBN :
978-0-7803-8877-2
Electronic_ISBN :
978-0-7803-8878-9
Type :
conf
DOI :
10.1109/SPCMTT.2005.4493156
Filename :
4493156
Link To Document :
بازگشت