• DocumentCode
    3296823
  • Title

    From the past to the future, with a challenge [telecom power supplies]

  • Author

    Cluse, P. ; Snell, G.

  • Author_Institution
    TELSTRA Network & Technol., Adelaide, SA, Australia
  • fYear
    1997
  • fDate
    19-23 Oct 1997
  • Firstpage
    165
  • Lastpage
    168
  • Abstract
    Telecommunications power requirements are changing. These changes are having significant impact on large full services telcos which must balance the needs of new telecommunications platforms with those of a diverse range of existing platforms and power systems. This paper examines these issues from the perspective of one such telco, Telstra (Australia). It proceeds to highlight the challenges that are being faced to ensure that a strategy is in place to handle the many and often conflicting requirements in a cost effective and flexible manner, whilst ensuring maximum reliability to the customer
  • Keywords
    power system reliability; telecommunication network reliability; telecommunication power supplies; Australia; Telstra; power systems; reliability; telecommunication companies; telecommunications platforms; telecommunications power requirements; Australia; Availability; Cable TV; Cables; Monitoring; Power system analysis computing; Power system management; Power system reliability; Power systems; Uninterruptible power systems;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Telecommunications Energy Conference, 1997. INTELEC 97., 19th International
  • Conference_Location
    Melbourne, Vic.
  • Print_ISBN
    0-7803-3996-7
  • Type

    conf

  • DOI
    10.1109/INTLEC.1997.645882
  • Filename
    645882