• DocumentCode
    329804
  • Title

    Simulation of manufacturer-supplier relationships

  • Author

    Hssain, A. Ait ; Chafik, S. ; Boisseau, N.

  • Author_Institution
    Lab. d´´Autom. Ind., Inst. Nat. des Sci. Appliquees, Villeurbanne, France
  • Volume
    4
  • fYear
    1998
  • fDate
    11-14 Oct 1998
  • Firstpage
    3714
  • Abstract
    The just-in-time concept (JIT), first applied inside manufacturing facilities, has been extended to include supply chain components. This involves partnerships among manufacturers and their suppliers. A new trend in this relationship, at least in automotive and aeronautic industries, is that some key suppliers are asked, not only to deliver the right parts in the right time, but also in the required order. We refer to this co-operation as synchronous. The paper presents a simulation-based approach for performance evaluation of tree-type synchronous manufacturing partnerships, with suppliers on the nodes and the manufacturer on the root. The approach involves two steps: global planning method, given the capacity of each supplier; simulation of part flows of a supplier or of the global organisation, given the planning and resources failures
  • Keywords
    manufacturing resources planning; production control; stock control; JIT; global organisation; global planning method; just-in-time concept; manufacturer-supplier relationships; part flows; simulation-based approach; supply chain components; tree-type synchronous manufacturing partnerships; Assembly; Capacity planning; Delay; Industrial relations; Job shop scheduling; Manufacturing industries; Production facilities; Production systems; Pulp manufacturing; Virtual manufacturing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Systems, Man, and Cybernetics, 1998. 1998 IEEE International Conference on
  • Conference_Location
    San Diego, CA
  • ISSN
    1062-922X
  • Print_ISBN
    0-7803-4778-1
  • Type

    conf

  • DOI
    10.1109/ICSMC.1998.726661
  • Filename
    726661