Title :
Profit-based head-dependent short-term hydro scheduling considering risk constraints
Author :
Pousinho, H.M.I. ; Mendes, V.M.F. ; Catalao, Joao P. S.
Author_Institution :
Univ. of Beira Interior, Covilha, Portugal
Abstract :
This paper is on the short-term hydro scheduling (STHS) problem, particularly concerning a head-dependent cascaded hydro system. A mixed-integer quadratic programming approach is proposed for the STHS problem, considering not only head-dependency, but also discontinuous operating regions and discharge ramping constraints. Moreover, market uncertainty is introduced in the model via price scenarios, and risk-aversion is considered by limiting the volatility of the expected profit. Numerical results, based on one of the main Portuguese cascaded hydro systems, illustrate the proficiency of the proposed approach. Finally, conclusions are duly drawn.
Keywords :
hydroelectric power stations; integer programming; power generation economics; power generation scheduling; power markets; pricing; quadratic programming; risk management; Portuguese cascaded hydro systems; discharge ramping constraints; discontinuous operating regions; market uncertainty; mixed-integer quadratic programming approach; profit-based head-dependent short-term hydro scheduling problem; risk-aversion; Computational modeling; Discharges; Power generation; Reservoirs; Upper bound; Vectors; Hydroelectric power generation; market price; mixed-integer quadratic programming; power generation scheduling; risk and uncertainty;
Conference_Titel :
PowerTech, 2011 IEEE Trondheim
Conference_Location :
Trondheim
Print_ISBN :
978-1-4244-8419-5
Electronic_ISBN :
978-1-4244-8417-1
DOI :
10.1109/PTC.2011.6019203