• DocumentCode
    3304033
  • Title

    Effective turbo-alternator maintenance through partnership

  • Author

    Bailey, T.G. ; Vaslet, S.

  • Author_Institution
    GEC Alsthom Power Generation, UK
  • fYear
    35886
  • fDate
    30 Mar-1 Apr1998
  • Firstpage
    115
  • Lastpage
    119
  • Abstract
    The demand for increased output from turboalternator units has sharpened the focus on three criteria: greater plant reliability; increased plant efficiency; and shorter downtimes for overhaul. Furthermore, electric utilities are striving to identify the core business activities and concentrate their resources on these, thus placing greater emphasis on external suppliers for support activities. These factors have placed great strain on both the traditional methods of managing outages and on the contractual arrangements between the supplier and the customer. This paper traces the development of a “partnership” process adopted for the preparation and execution of turboalternator outages
  • Keywords
    turbogenerators; efficiency; electric utilities; outage management; overhaul downtimes; partnership process; reliability; turboalternator maintenance;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Power Station Maintenance - Profitability Through Reliability, 1998. First IEE/IMechE International Conference on (Conf. Publ. No. 452)
  • Conference_Location
    Edinburgh
  • ISSN
    0537-9989
  • Print_ISBN
    0-85296-699-7
  • Type

    conf

  • DOI
    10.1049/cp:19980072
  • Filename
    674054