DocumentCode
330497
Title
A preliminary flow algorithm of network flow programming in economic dispatching of cascade hydropower station
Author
Guang, Wang Da ; Feng, Chen
Author_Institution
Fujian Electr. Power Test & Res. Inst., Fuzhou, China
Volume
1
fYear
1998
fDate
18-21 Aug 1998
Firstpage
581
Abstract
In this paper, a network flow model in the economic dispatching of cascade hydroelectric power stations is established. This paper presents a preliminary flow algorithm which uses practical data that reflect the relationship between natural incoming water of the cascade with the maximum installed unit capacity and the distribution of power output among all cascades. Beginning with the distribution of power output, using an iteration method and rectifying deviation, a practical preliminary flow is gained. This algorithm is realized in the economic dispatching of a practical 380 MW four-cascade hydropower station, the results are satisfied, and an example is given in this paper
Keywords
hydroelectric power stations; iterative methods; optimisation; power generation dispatch; power generation economics; power generation planning; 380 MW; cascade hydropower station; economic dispatching; iteration method; maximum installed unit capacity; natural incoming water; network flow programming; power output distribution; preliminary flow algorithm; Cost function; Dispatching; Hydroelectric power generation; Intelligent networks; Power generation; Power generation economics; Reservoirs; Testing; Water resources; Water storage;
fLanguage
English
Publisher
ieee
Conference_Titel
Power System Technology, 1998. Proceedings. POWERCON '98. 1998 International Conference on
Conference_Location
Beijing
Print_ISBN
0-7803-4754-4
Type
conf
DOI
10.1109/ICPST.1998.729031
Filename
729031
Link To Document