Title :
One Utility´s Experience in Justification and Implementation of Relay Replacement projects
fDate :
Oct. 29 2006-Nov. 1 2006
Abstract :
This paper summarizes a panel session presentation on one Canadian electric utility´s experience in justification of some protection replacement projects. BC Hydro has implemented large scale protection replacement or upgrading projects for a variety of reasons that will be discussed. Further, the experience since implementation of some of the projects is described
Keywords :
electricity supply industry; power system protection; relay protection; BC Hydro; Canadian electric utility´s experience; relay protection replacement projects; Costs; Large-scale systems; Manufacturing; Power system protection; Power transmission lines; Protective relaying; Relays; Security; Testing; Voltage;
Conference_Titel :
Power Systems Conference and Exposition, 2006. PSCE '06. 2006 IEEE PES
Conference_Location :
Atlanta, GA
Print_ISBN :
1-4244-0177-1
Electronic_ISBN :
1-4244-0178-X
DOI :
10.1109/PSCE.2006.296258