DocumentCode :
33121
Title :
Multi-Area Unit Scheduling and Reserve Allocation Under Wind Power Uncertainty
Author :
Ahmadi-Khatir, Ali ; Conejo, Antonio J. ; Cherkaoui, R.
Author_Institution :
Power Syst. Res. Group, Ecole Polytech. Fed. de Lausanne, Lausanne, Switzerland
Volume :
29
Issue :
4
fYear :
2014
fDate :
Jul-14
Firstpage :
1701
Lastpage :
1710
Abstract :
This paper proposes a decentralized methodology to optimally schedule generating units while simultaneously determining the geographical allocation of the required reserve. We consider an interconnected multi-area power system with cross-border trading in the presence of wind power uncertainty. The multi-area market-clearing model is represented as a two-stage stochastic programming model. The proposed decentralized procedure relies on an augmented Lagrangian algorithm that requires no central operator intervention but just moderate interchanges of information among neighboring regions. The methodology proposed is illustrated using an example and a realistic case study.
Keywords :
power generation scheduling; power markets; power system interconnection; stochastic programming; wind power plants; augmented Lagrangian algorithm; cross-border trading; decentralized methodology; generating units; geographical allocation; interconnected multiarea power system; multiarea market-clearing model; multiarea unit scheduling; reserve allocation; two-stage stochastic programming model; wind power uncertainty; Indexes; Mathematical model; Power systems; Resource management; Stochastic processes; Uncertainty; Wind power generation; Decentralized unit scheduling; interconnections; multi-area power system; reserve allocation; wind power;
fLanguage :
English
Journal_Title :
Power Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8950
Type :
jour
DOI :
10.1109/TPWRS.2013.2293542
Filename :
6689354
Link To Document :
بازگشت