• DocumentCode
    3312412
  • Title

    Case study on communication enterprises whole lifecycle risk management with ISM

  • Author

    Chenchen Zhang ; Yu Zhang ; Xiaoyao Wan ; Jiangping Wan

  • Author_Institution
    Sch. of Comput. Sci. & Eng., South China Univ. of Technol., Guangzhou, China
  • Volume
    4
  • fYear
    2011
  • fDate
    26-28 July 2011
  • Firstpage
    2354
  • Lastpage
    2357
  • Abstract
    In this paper, the risk management case of WH Company´s UC project is studied with risk management theory and life-cycle theory. Firstly, the risk structure model is derived by analyzing WH Company´s UC project with interpretative structural model (ISM). Then, the project key risks which communication enterprises are faced with are analyzed and demonstrated; what´s more, suggestions on project risk management are raised accordingly. Finally, a lifecycle risk management model of communication enterprises is put forward.
  • Keywords
    project management; risk management; telecommunication industry; telecommunication network management; UC project; WH company; communication enterprises; interpretative structural model; lifecycle risk management; project key risks; project risk management; risk structure model; telecommunication network; Analytical models; Companies; Outsourcing; Production; Project management; Risk management; Training; Communication Enterprises; Interpretative Structural Model; Project Management; Risk Management; Whole Lifecycle;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Fuzzy Systems and Knowledge Discovery (FSKD), 2011 Eighth International Conference on
  • Conference_Location
    Shanghai
  • Print_ISBN
    978-1-61284-180-9
  • Type

    conf

  • DOI
    10.1109/FSKD.2011.6019959
  • Filename
    6019959