DocumentCode
3313381
Title
An intelligent integrated scheduling model for Flexible Manufacturing System
Author
Sankar, S.S. ; Ponnambalam, S.G.
Author_Institution
Dept. of Mech. Eng., Arulmigu Kalasalingam Coll. of Eng., India
Volume
2
fYear
2004
fDate
1-3 Dec. 2004
Firstpage
1095
Abstract
This paper deals with the simultaneous scheduling of incoming jobs, machines, and vehicle dispatching in a flexible manufacturing system (FMS) having a single device, an automated guided vehicle (AGV). The objective is to find an optimal sequence of incoming parts, which will reduce the waiting times due to blocking and starving of resources and deadheading times, resulting in overall minimization of makespan. In this work a genetic algorithm based iterative procedure which accommodates the combinatorial nature of the problem is proposed to approximately solve the integrated scheduling problem. The procedure is evaluated through different benchmark problems and the outcome of the study is encouraging and paves the way for further research in this area.
Keywords
automatic guided vehicles; flexible manufacturing systems; genetic algorithms; iterative methods; scheduling; automated guided vehicle; deadheading times; flexible manufacturing system; genetic algorithm based iterative procedure; incoming job scheduling; intelligent integrated scheduling model; machine scheduling; makespan minimization; optimal incoming part sequence; resource blocking; resource starving; vehicle dispatch scheduling; waiting times; Automotive engineering; Educational institutions; Flexible manufacturing systems; Job shop scheduling; Materials handling; Mechanical engineering; Optimal scheduling; Processor scheduling; Production; Vehicles;
fLanguage
English
Publisher
ieee
Conference_Titel
Robotics, Automation and Mechatronics, 2004 IEEE Conference on
Print_ISBN
0-7803-8645-0
Type
conf
DOI
10.1109/RAMECH.2004.1438072
Filename
1438072
Link To Document