• DocumentCode
    3314243
  • Title

    Development of an Alternative Black- Start Plan for System Restoration

  • Author

    Datta, Samrat ; Kolluri, Sharma ; He, Tao ; Khodabakhchian, Bahram

  • Author_Institution
    Entergy Services, Inc., New Orleans, LA
  • fYear
    2006
  • fDate
    Oct. 29 2006-Nov. 1 2006
  • Firstpage
    1833
  • Lastpage
    1839
  • Abstract
    Following hurricanes Katrina and Rita that hit the Louisiana gulf coast, the designated black-start generating unit in southern Louisiana suffered extensive damage. Studies were performed to identify alternate means of restoring the system in the event of a system-wide black out. One of the options considered was to utilize an existing black-start unit in Northern Louisiana to energize the existing 500 kV lines to Southern Louisiana in order to provide start-up power for the generating units in that region. This paper discusses critical issues related to generator, substation and transmission equipment that were considered while developing the black-start plan
  • Keywords
    power system faults; power system planning; power system restoration; 500 kV; Katrina hurricane; Louisiana gulf coast; Rita hurricane; black-start generating unit; black-start plan; start-up power; system restoration; Feedback circuits; Helium; Hurricanes; Power generation; Power system restoration; Power transmission lines; Regulators; Resonance; Substations; US Department of Transportation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Systems Conference and Exposition, 2006. PSCE '06. 2006 IEEE PES
  • Conference_Location
    Atlanta, GA
  • Print_ISBN
    1-4244-0177-1
  • Electronic_ISBN
    1-4244-0178-X
  • Type

    conf

  • DOI
    10.1109/PSCE.2006.296191
  • Filename
    4076017