DocumentCode :
3321436
Title :
The theory analysis and data track of the material balance system
Author :
Cheng, Wushan
Author_Institution :
Shanghai Univ. of Eng. Sci., Shanghai
fYear :
2007
fDate :
8-11 July 2007
Firstpage :
310
Lastpage :
315
Abstract :
In this paper, based on the property of the long time delay of sinter process, the theory analysis of large delay model is used to describe the relation between the mechanical electric time constant and pure delay time, and the data tracking is proposed to solve the problem of large delay which making the system quality factor go bad. Through the system testing and running on line of two years, the advanced operating mode can eliminate the contradiction of advanced control system with domestic first and second apparatus, and advanced control technology with conventional management mode. The technology can satisfy the continuous running and stable requirement of large-scale sintering machine production.
Keywords :
delay systems; process control; sintering; tracking; advanced control system; data tracking; large delay system; large-scale sintering machine production; material balance system; mechanical electric time constant; pure delay time; sinter process; Control systems; Data analysis; Data engineering; Delay effects; Flowcharts; Iron; Ores; Production; Proportional control; Space technology; Data track; Large delay; Material balance; Sinter process;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Information Acquisition, 2007. ICIA '07. International Conference on
Conference_Location :
Seogwipo-si
Print_ISBN :
1-4244-1220-X
Electronic_ISBN :
1-4244-1220-X
Type :
conf
DOI :
10.1109/ICIA.2007.4295748
Filename :
4295748
Link To Document :
بازگشت