DocumentCode :
3326886
Title :
Manufacturing planning and scheduling: where we are and where we need to be
Author :
Kempf, Karl G.
Author_Institution :
Intel Corp., Santa Clara, CA, USA
fYear :
1989
fDate :
6-10 Mar 1989
Firstpage :
13
Lastpage :
19
Abstract :
The lack of robust geometric reasoning components in most current process planning expert systems is discussed. The lack of metaknowledge in most existing production-scheduling systems is examined. The large amount of effort required to bring a research system into daily factory use is detailed. Finally, the large amount of effort needed to integrate intelligent planning and scheduling is considered
Keywords :
expert systems; knowledge based systems; knowledge engineering; manufacturing data processing; scheduling; geometric reasoning; intelligent planning; knowledge engineering; manufacturing DP; metaknowledge; process planning expert systems; production-scheduling systems; scheduling; Artificial intelligence; Design engineering; Educational institutions; Job shop scheduling; Laboratories; Machining; Process planning; Production facilities; Pulp manufacturing; USA Councils;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Artificial Intelligence Applications, 1989. Proceedings., Fifth Conference on
Conference_Location :
Miami, FL
Print_ISBN :
0-8186-1902-3
Type :
conf
DOI :
10.1109/CAIA.1989.49132
Filename :
49132
Link To Document :
بازگشت